DETAILS

Services: Project Management

Asset class: Residential

Period of performance: 2016 -2017

Location: Berlin

Client: GSW, on behalf of KVL Projektmanagement Berlin GmbH

The Future Living® Berlin innovation house project was developed, planned and built by GSW from 2015 to 2020 on the initiative of the Krebs Group. As a lighthouse project for the living of the future, state-of-the-art smart building technologies were used in its realisation. The energy concept of Future Living® Berlin is based on a holistic, integrative and decentralised energy supply model in the EnergiePlus standard.

The development was carried out in cooperation with renowned partners such as Panasonic, Mercedes Benz AG and others. In 2016 – 2017, REELAB carried out an economic and technical optimisation of the project on behalf of KVL Projektmanagement Berlin GmbH and prepared the award of the general contractor contract.

Further information on the project: https://future-living-berlin.com/

product-images
product-images
product-images
product-images
product-images
product-images

ADRESS:

Rosenstraße 2
10178 Berlin

[borlabs-cookie id="googlemaps" type="content-blocker"]
[/borlabs-cookie]